The Seller (Supplier) shall abide by the requirements in this document when the phrase “QA Requirements Apply” appears on the Purchase Order. Otherwise these requirements do not apply. Failure to comply with any or all applicable Quality Clause(s) is subject to rejection by Incoming Inspection and may affect the Supplier approval status.
During performance on this order, the Seller’s quality control or inspection system and manufacturing processes are subject to review, verification and analysis by authorized Government or INVERIS TRAINING SOLUTIONS Customer representatives. You will be expected to provide reasonable accommodation, facilities and assistance as required. Government inspection or release of product prior to shipment is not required unless the Seller is otherwise notified.
If the phrase “GSI Required” appears on the Purchase Order, Government inspection is required prior to shipment from the Seller’s plant. Upon receipt of this order, promptly notify the Government Representative who normally services the Seller’s plant so that appropriate planning for Government Inspection can be accomplished.
The Seller shall package and ship items delivered to the Buyer in such a manner as to preclude damage or degradation during shipment and in accordance with Reference Document WS-112 (INVERIS TRAINING SOLUTIONS Packaging Requirements)
Any and all materials shipped against the Buyer’s purchase order shall be subject to Incoming Inspection at the Buyer’s location. The Buyer has the right to determine how and to what extent the materials will be inspected at the Buyer location. If materials are found to be defective or not in conformity with the requirements of this purchase order, the Buyer shall have the right to reject some or all of the same materials associated with this purchase order and require that such materials be corrected or replaced promptly with materials which are not defective or are in conformity with such requirements. Nonconforming materials may be returned at the Seller’s expense or may be reworked, at the Buyer’s discretion, by the Buyer at the Seller’s expense. Subject to rejections or nonconformance, the Seller shall perform 100% inspection of all characteristics on all material(s) covered by this purchase order at the Seller’s expense. Records of inspection results shall accompany each delivery of material(s).
For electrostatic sensitive material, the Supplier shall maintain an Electrostatic Discharge Control program in accordance with MIL-STD-1686, MIL-HDBK-263, and ANSI/ESD-20-20.
Printed circuit assemblies, all electro-optical or semiconductor components and any other ESD sensitive devices shall be treated as MIL-STD-1686, Class I.
A First Article Inspection (FAI) is a complete verification that the article being inspected complies with the requirements identified in engineering drawings, specifications, and purchase orders as well as any other applicable design requirement(s).
It shall be understood that rework of product by the Seller is authorized, provided the product still retains all original characteristics and/or properties and meets the intent of the blue print. Repair of any product which alters its original configuration is unauthorized and strictly forbidden without prior written consent from INVERIS TRAINING SOLUTIONS s Quality Department in the form of an approved Request for Deviation\Waiver (INVERIS TRAINING SOLUTIONS Form Q-11, MRB-Vendor Deviation Request (VDR)), available from Purchasing or Quality Assurance. For example, the practice of adding material to incorrectly machined parts by welding is not allowed unless previously approved by INVERIS TRAINING SOLUTIONS s Quality Department or authorized by the Engineering Drawing specified on the Purchase Order. VDR submittals shall include supplier-recommended dispositions with sufficient technical, quality, and reliability justification. Copies of the VDR approved by INVERIS TRAINING SOLUTIONS shall accompany shipment of materials involved.
The Supplier shall provide prompt written notification to the Buyer when nonconforming material or products affecting a drawing, Purchase Order or specification requirement issues are discovered. The Supplier shall not ship such nonconforming material or product until written authorization to ship has been received from the Buyer in the form of an approved Request for Deviation\Waiver (INVERIS TRAINING SOLUTIONS Form Q-11, MRB-Vendor Deviation Request (VDR)), available from Purchasing or Quality Assurance. VDR submittals shall include supplier-recommended dispositions with sufficient technical, quality, and reliability justification. Upon authorization to ship, the non- conforming product must be labeled as non-conforming by the Supplier before shipment and all documentation related to the nonconforming product shall accompany the product at time of shipment.
The Supplier must be able to maintain a Quality System that ensures adequate product conformance and appropriate objective evidence to meet usual business responsibilities. It is preferable that Suppliers are able to maintain a Quality System that meets or exceeds ISO 9001(current revision). The Supplier shall notify Buyer within two working days if any ISO certifications are revoked or suspended.
Neither surveillance, inspection and/or tests made by the Buyer or his representatives at either the Supplier’s or Buyer’s facility nor the Supplier’s compliance with all applicable Quality Assurance Requirements shall relieve the Supplier of the responsibility to furnish items which conform to the requirements of the Purchase Order.
In the event of a conflict in requirements between technical documents, the following order of precedence shall prevail:
Note: Contact the authorized buyer regarding any questions or concerns.
The Supplier shall flow down all relevant quality requirements imposed by the Buyer to any sub-tier Suppliers processing hardware for the Buyer’s Purchase Order.
For all special processes (i.e. plating, anodizing, heat treating, annealing, etc.), the Supplier shall maintain adequate controls to ensure processes are performed in accordance with applicable specifications and will achieve the planned results. For each special process performed, the Supplier shall furnish Certificates of Conformance in accordance with applicable specifications and/or engineering drawings. The Certificates must reference the vendor performing the process, the applicable standard, and the measured results. Any documentation associated shall be controlled by the supplier and produced upon request as applicable.
The Supplier shall perform all inspections and tests using calibrated equipment. Equipment must be calibrated at regular, established intervals by measurement standards which are traceable to one or more of the following:
For calibration service providers or test laboratories, accreditation to ISO 17025 is preferred.
For Supplier-controlled drawings, the Supplier shall maintain a specific and unique part number with revision control. The Buyer must be informed of any significant change affecting the design or manufacturing process/location. Significant changes include, but may not be limited to, changes that affect performance, integration, system compatibility, size, function, functional performance, testing requirements, material, material types etc.
The Supplier/subcontractor must take an active role in the elimination of all possible electrical shipments containing counterfeit parts. The Supplier/subcontractor must only supply parts which are traceable to the actual manufacturer. The requirements of AS6174 and/or AS5553 are to be met.
Materials shall be free of foreign materials, gross imperfections, damage or any other evidence of poor workmanship that shall render the material unsuitable for its intended use and shall be uniform in quality and condition consistent with good industry practices.
Supplier shall maintain a copy of the material test report from the raw material supplier which contains the complete chemical and mechanical test data that has been verified by the supplier as meeting the acceptance requirements of the applicable raw material specification and/or engineering drawing.